The Detroit Metropolitan Airport Gateway project opened February 24, 2002. This is PCP’s largest project in the history of PCP at $36M. This terminal is a work of art inside and out. From the exterior, the curving metal roof symbolizes wings and flight. Inside, the high-arched ceilings make the interior open and spacious. The facility provides travelers with easy access to a wide variety of shopping and restaurant options before or between flights.


With the 1 mile long facility, PCP installed over 30 miles of partitions, 2.5M sf of Drywall, 1.5M sf of Ceilings and over 300,000 man-hours, peaking at a 170 person crew.


General Contractor

Hunt Construction Group


Owner

Delta Airlines


Architect

Smith Group


Location

Romulus Michigan


Completion Date

2002

Project Scope

  • Acoustical Ceilings

  • Cold Formed Framing

  • Densglass Sheathing

  • Doors, Frames & Hardware

  • Drywall Taping & Finishing

  • Insulation

  • Plywood Sheathing

  • Rough Blocking

  • Shaftwall

  • Custom Metal Corrugated Ceilings

  • Custom Metal Pan Ceilings

Our Projects

We have the "know-how" you need.

 
bottom of page