Detroit Metropolitan Airport - McNamara Terminal - Delta Airlines (Formally Northwest Airlines)
The Detroit Metropolitan Airport Gateway project opened February 24, 2002. This is PCP’s largest project in the history of PCP at $36M. This terminal is a work of art inside and out. From the exterior, the curving metal roof symbolizes wings and flight. Inside, the high-arched ceilings make the interior open and spacious. The facility provides travelers with easy access to a wide variety of shopping and restaurant options before or between flights.
With the 1 mile long facility, PCP installed over 30 miles of partitions, 2.5M sf of Drywall, 1.5M sf of Ceilings and over 300,000 man-hours, peaking at a 170 person crew.
General Contractor
Hunt Construction Group
Owner
Delta Airlines
Architect
Smith Group
Location
Romulus Michigan
Completion Date
2002
Project Scope
Acoustical Ceilings
Cold Formed Framing
Densglass Sheathing
Doors, Frames & Hardware
Drywall Taping & Finishing
Insulation
Plywood Sheathing
Rough Blocking
Shaftwall
Custom Metal Corrugated Ceilings
Custom Metal Pan Ceilings
Our Projects
We have the "know-how" you need.