PCP has been awarded the ZEISS Project Wolverine job by The Christman Company. ZEISS is an internationally leading technology enterprise operating in the fields of optics and optoelectronics. Their products have even been to the moon! The new 85,000 square foot facility will consolidate 4 other ZEISS facilities in Michigan into one large facility. The facility will contain a customer demonstration area with new technologies and systems, training, support and metrology services, and house fixture system production and assembly. PCP is performing the Metal Studs, Drywall, Ceilings Package, and Acoustical Baffles/Heartfelt Ceilings.