The Detroit Metropolitan Airport Gateway project opened February 24, 2002. This is PCP’s largest project in the history of PCP at $36M. This terminal is a work of art inside and out. From the exterior, the curving metal roof symbolizes wings and flight. Inside, the high-arched ceilings make the interior open and spacious. The facility provides travelers with easy access to a wide variety of shopping and restaurant options before or between flights.

With the 1 mile long facility, PCP installed over 30 miles of partitions, 2.5M sf of Drywall, 1.5M sf of Ceilings and over 300,000 man-hours, peaking at a 170 person crew.